STS - 1

Created on 06 March 2026 at 14:33
Hey Hey
#1 PASS
Category
Product delivery
Inspection Points & Requirements
The model and quantity of the STSs received by the customer are consistent with those in the contract.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#2 PASS
Category
Consistency between the packing list and delivered products
Inspection Points & Requirements
The packing list consists of the delivered products. The spare parts and accessories are complete and delivered with the STS.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#3 PASS
Category
STS appearance
Inspection Points & Requirements
1. The enclosure of the STS is free of damage, dents, and cracks. 2. If there is a small area of rust, paint the area according to the user manual. A large area (0.5 m2 or above) of rust is not allowed.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#4 PASS
Category
STS sealing
Inspection Points & Requirements
The sealing rubber strips are intact and do not fall off. There is no crack in the sealing areas.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#5 PASS
Category
Screen doors of the transformer room
Inspection Points & Requirements
The screen doors of the transformer room are intact without deformation.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#6 PASS
Category
Doors of low-voltage (LV) and medium voltage (MV) rooms
Inspection Points & Requirements
The doors are closed tightly. No water or foreign matter is found in the LV or MV room.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#7 PASS
Category
STS Installation
Inspection Points & Requirements
The STS is installed at the specified position.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#8 PASS
Category
STS stability
Inspection Points & Requirements
The STS is securely installed in the right position without tilt or force around. The onsite foundation meets the requirements in the STS user manual.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#9 PASS
Category
STS grounding
Inspection Points & Requirements
The screws on the ground point of the enclosure are tightened and aligned with the marked lines. The ground label at the ground point is intact.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#10 PASS
Category
Grounding of the transformer and doors of the container, LV panel, and MV room
Inspection Points & Requirements
The transformer and doors of the container, LV panel, and MV room, as well as other accessible places, are grounded, grounding labels are in place, and ground cables are securely connected.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#11 PASS
Category
STS grounding
Inspection Points & Requirements
Measure the resistance between two ground points by using a ground resistance tester.
Inspection Method
Test inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#12 PASS
Category
Damage or shifts of the components in the STS
Inspection Points & Requirements
All components in the STS are free of damage, deformation, and visible shifts.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#13 PASS
Category
Cables in the STS
Inspection Points & Requirements
Cables in the STS are securely installed.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#14 PASS
Category
Total capacity of the connected inverters
Inspection Points & Requirements
The total capacity of the connected inverters does not exceed the rated capacity of the STS.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#15 PASS
Category
Cross-sectional areas of input and output power cables
Inspection Points & Requirements
The cross-sectional areas of the input and output power cables are within 30 mm away from each other as specified in the installation manual (pg 106).
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#16 PASS
Category
Connections of input and output power cables as well as communications cables
Inspection Points & Requirements
All cables are secured to prevent disconnection or safety incidents.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#17 PASS
Category
Bend radius of AC power cables
Inspection Points & Requirements
The cable bend radius is at least 15 times the cable cross-sectional area (50-500 mm2). A small bend radius will result in excessive stress on the power cable, exerting negative impact on the device.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#18 PASS
Category
AC power cables and communications cables reserved in the STS for the Smart Array Controller (SACU)
Inspection Points & Requirements
1. The AC power cables and communications cables reserved in the STS for the SACU are correctly connected to the SACU. The PG connectors at the holes for cables between the SACU and the STS are sealed. 2. Both ends of the reserved AC power cables and communications cables (if unused) are not energized (the switches in the LV panel are turned off or the cables are removed). The cables are properly protected and the PG connectors at the holes for cables between the SACU and the STS are intact.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#19 PASS
Category
LV panel stability
Inspection Points & Requirements
The panel and internal components are secured reliably and securely.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#20 PASS
Category
LV panel reliability of cable connections
Inspection Points & Requirements
The internal cables are securely connected and aligned with the marked lines.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#21 PASS
Category
LV panel grounding reliability
Inspection Points & Requirements
The panel is well grounded inside. The screws on the ground point are tightened and aligned with the marked lines. The ground label at the ground point is intact.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#22 PASS
Category
LV panel foreign matter
Inspection Points & Requirements
There is no foreign matter such as tools and cable residue in the panel.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#23 PASS
Category
LV panel bottom sealing
Inspection Points & Requirements
The cable holes at the bottom of the LV panel have been sealed using firestop putty.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#24 PASS
Category
LV panel copper bars
Inspection Points & Requirements
The copper bars in the LV room of the STS are not loose, disconnected, or deformed.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#25 PASS
Category
Cable labels
Inspection Points & Requirements
Labels on incoming AC power cables of the LV panel are intact and legible.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#26 PASS
Category
Connection of AC cables
Inspection Points & Requirements
Adjust the torque wrench to a proper torque and rotate the handle to ensure that the screws tightened.
Inspection Method
Test inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#27 PASS
Category
LV panel switches
Inspection Points & Requirements
Turn on and off the disconnectors, miniature circuit breakers (MCBs), and molded case circuit breakers (MCCBs) in the LV panel.
Inspection Method
Test inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#28 PASS
Category
Transformer enclosure
Inspection Points & Requirements
The transformer enclosure is free of defects and paint peeling.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#29 PASS
Category
Transformer enclosure grounding
Inspection Points & Requirements
The screws on the ground point of the enclosure are tightened and aligned with the marked lines. The ground label at the ground point is intact.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#30 PASS
Category
Transformer sealing
Inspection Points & Requirements
Check all sealing rings of the transformer, including the seal of the transformer box, oil level meter, oil temperature meter, heat sink, oil drain valve, butterfly valve, and tap changer.
Inspection Method
Test inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#31 PASS
Category
Transformer pressure release valve
Inspection Points & Requirements
The clamping plate for the pressure release valve is removed, and the actuating strut of the pressure release valve is in the normal position.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#32 PASS
Category
Transformer gas relay
Inspection Points & Requirements
There is no gas in the transformer gas relay (gas needs to be released if any).
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#33 PASS
Category
Transformer butterfly valve
Inspection Points & Requirements
The butterfly valves on both sides of the gas relay are open.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#34 PASS
Category
Transformer oil temperature indicator (OTI) and winding temperature indicator (WTI, if any)
Inspection Points & Requirements
The appearance of the OTI and WTI (if any) is normal, the pointer indication is normal, and there is no foreign matter in the watch face.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#35 PASS
Category
Transformer oil level meter
Inspection Points & Requirements
1. The oil level meter can be observed without obstacles. 2. The indicated oil level is in accordance with the oil level-oil temperature curve of the transformer.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#36 PASS
Category
Transformer dehydrating breather
Inspection Points & Requirements
Before the STS is put into operation, the dehydrating breather is properly installed. The dehydrating breather (common model) appearance is normal and intact, and the color of the silicon gel is normal. If the color of more than half of the silicon gel is abnormal, replace the silicon gel in the dehydrating breather.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#37 PASS
Category
Transformer tap changer setting
Inspection Points & Requirements
The transformer tap changer is set to position 3 before delivery. Adjust the tap changer position based on site requirements and tighten the protective cover.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#38 PASS
Category
MV room stability
Inspection Points & Requirements
All internal components are securely installed without shifting or loosening.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#39 PASS
Category
MV room reliability of cable connections
Inspection Points & Requirements
The internal cables are securely connected and aligned with the marked lines.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#40 PASS
Category
MV room grounding reliability
Inspection Points & Requirements
The screws on the indoor ground point of the enclosure are tightened and aligned with the marked lines. The ground label at the ground point is intact.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#41 PASS
Category
MV room foreign matter
Inspection Points & Requirements
There is no foreign matter, such as tools and cable residue, in the MV room.
Inspection Method
Visual inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#42 PASS
Category
MV room gas pressure indicator of the ring main unit
Inspection Points & Requirements
Check and record the value of the gas pressure indicator of the ring main unit. If a ring main unit indicator is used, record the color of the pointed area.
Inspection Method
Test inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#43 PASS
Category
Connection of incoming and outgoing AC cables
Inspection Points & Requirements
Adjust the torque wrench to the proper torque and rotate the handle to ensure that the screws are tightened.
Inspection Method
Test inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#44 PASS
Category
MV room switch off the ring main unit
Inspection Points & Requirements
Turn on and off the switches of the ring main unit.
Inspection Method
Test inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated:
#45 PASS
Category
MV room switches in the auxiliary power distribution box
Inspection Points & Requirements
Turn on and off the fuses and circuit breakers in the auxiliary power distribution box.
Inspection Method
Test inspection
Comments
(none)
Evidence (photo)
(none)
Acceptance notes
(none)
Last updated: